A A A
  • Back to ISA-RP77.60.05-2001 (R2012), Fossil Fuel Power Plant Human-Machine Interface: Task Analysis

    ISA-RP77.60.05-2001 (R2012), Fossil Fuel Power Plant Human-Machine Interface: Task Analysis

    ISA-RP77.60.05-2001 (R2012), Fossil Fuel Power Plant Human-Machine Interface: Task Analysis
    Format
    Format Select
    select

    Item Details:

    Approaches are provided in this recommended practice for the application of task analysis during the conceptual design, preliminary design, and detailed design phases, as well as the test and evaluation of new control rooms/systems and control room upgrade/development programs.
    Back to ISA-RP77.60.05-2001 (R2012), Fossil Fuel Power Plant Human-Machine Interface: Task Analysis