• ISA77.30, Dynamic Performance of Power Plant Control Systems


    Standards Button

    Scope

    The standard defines test procdures, data collection requirements, and data analysis methods for determining and reporting the dynamic performance of control systems for boiler and turbine control systems on generating units with a rated capacity of 25 MW or greater or a boiler steam flow greater than 25 kg/s (200,000 lb/hr). This standard covers all aspects of plant operation including constant load operation, normal load ramping operation, grid regulation operation, and response to frequency upset, load runback, and load rundown operation.

    Purpose

    The purpose of this standard is to establish dynamic performance criteria for power plant control systems by specifying a consistent means of evaluating control system performance necessary to comply with contractual specifications and grid regulations.

    A Word from the Chairman

    ISA77.30 is working on a new standard.  If you are interested in participating in this activity or would like more information, please contact

    Eliana Brazda
    ISA Standards Administrator
    ebrazda@isa.org
    (919) 990-9228

    Cyrus Taft
    ISA77.30 Chair

  • Contacts

    All »