• ISA77.30, Dynamic Performance of Power Plant Control Systems


    Scope

    The standard defines test procdures, data collection requirements, and data analysis methods for determining and reporting the dynamic performance of control systems for boiler and turbine control systems on generating units with a rated capacity of 25 MW or greater or a boiler steam flow greater than 25 kg/s (200,000 lb/hr). This standard covers all aspects of plant operation including constant load operation, normal load ramping operation, grid regulation operation, and response to frequency upset, load runback, and load rundown operation.

    Purpose

    The purpose of this standard is to establish dynamic performance criteria for power plant control systems by specifying a consistent means of evaluating control system performance necessary to comply with contractual specifications and grid regulations.

    A Word from the Chairman

    ISA77.30 recently published a new technical report, ANSI/ISA-TR77.30.01-2015, Power Plant Control System Dynamic Performance Test Methods and Procedures. The committee is not currently working on any other documents.

    Cyrus Taft
    ISA77.30 Chair

  • Contacts

    Managing Director
    Joseph Weiss

    joe.weiss@realtimeacs.com
    (408) 2537934

    Voting Member Chair
    Cyrus Taft

    cwtaft@taftengineering.com
    (865) 8504460

    Voting Member
    Gary Cohee

    garyacohee@aol.com
    (409) 7901945

    Voting Member
    Robert Hubby

    bob.hubby@verizon.net
    (508) 3622317

    Voting Member
    Daniel Lee

    dan.lee@us.abb.com
    (440) 5856063

    Voting Member
    John Plenge

    jwesleyplenge@me.com
    (540) 3877741

    Voting Member
    David Roney

    dendroney@earthlink.net
    (303)884 2674

    Voting Member
    Jacques Smuts

    jsmuts@opticontrols.com
    (713) 4596291

    Voting Member
    Paul Toigo

    toigopaul@gmail.com

    Staff Contact
    Eliana Brazda

    ebrazda@isa.org
    (919) 9909228