• ISA77.20, Fossil Simulators Functional Requirements


    Scope

    This subcommittee will establish functional requirements for several types of fossil-fueled power plant control room simulators primarily used for operator training. It will also set criteria for the degree of hardware replication and software modelling detail, as well as the performance and functional capabilities of the simulated control room instrumentation. This activity will not address criteria for simulators used for engineering or test purposes such as part-task training devices intended for specialized training, nor for the use of simulators in training programs.

    Purpose

    The purpose of Subcommittee ISA77.20 is to develop functional requirements that will serve as a reference for those involved in the design, purchase, or usage of fossil-fueled power plant control room simulators primarily used for operator training.

    A Word from the Chairman

    Co-Chairmen Alex Lekich and Allan Zadiraka report that the revised standard ANSI/ISA-77.20.01-2012, Fossil Fuel Power Plant Simulators - Functional Requirements, has been published.

    For more information, please contact

    Eliana Brazda
    ISA Standards Administrator
    ebrazda@isa.org
    (919) 990-9228

  • Contacts

    Managing Director
    Joseph Weiss

    joe.weiss@realtimeacs.com
    (408) 2537934

    Voting Member Chair
    Alex Lekich

    alex.lekich@gses.com
    (410) 9707800

    Voting Member
    Robert Boire

    robert.boire@l-3com.com
    (514) 7874756

    Voting Member
    Kevin Smith

    smithkd999@yahoo.com
    (440) 5857159

    Voting Member
    William Talbot

    wtalbot@talbotsimulationassociates.com
    (314) 3069323

    Voting Member
    David Vann

    dvann@traxintl.com
    (434) 4857164

    Staff Contact
    Eliana Brazda

    ebrazda@isa.org
    (919) 9909228