Certified Automation Professionals (CAPs) are responsible for the direction, design, and deployment of systems and equipment for manufacturing and control systems.

CAP question

In a 24-VDC open-collector output sinking configuration, which of the following could occur?

A. Configuration increases the risk of electrostatic discharge (ESD) from static electricity.
B. Short circuit from the load device to ground can cause unintended actuation.
C. The triode for alternating current (TRIAC) could remain on when the current (but not voltage) is zero unless a snubber network is used.
D. Inductive devices, such as motors, can generate back electromagnetic fields when turned on.

CAP Answer

The correct answer is B, “Short circuit from the load device to ground can cause unintended actuation.” An NPN (sinking) open-collector, when “energized,” switches the load side of the relay (at terminal “A”) to ground (terminal “B”). In the drawing, the NPN open-collector is energized at its base with a light-emitting diode in an optically isolated programmable logic controller output card.

If the circuit below “short circuits” from the load device (relay) to ground, it would have the same effect as switching on the NPN open-collector, and the relay (load) would be actuated.

Note: Resistors that are typically installed in these circuits to regulate or limit current have not been shown for simplicity of illustration.
Jul/Aug CAP Illustration Main image

Reference: Trevathan, Vernon L., A Guide to the Automation Body of Knowledge, Second Edition, ISA, 2006.

 

More Certification Review

2017
May/Jun
CAP: The function of the rotor in an AC induction motor
CCST: Level measuring system

Mar/Apr
CAP: Processing of the PID algorithm
CCST: Providing a sample to extractive field analytical instruments

Jan/Feb
CAP: Definition of ALARM
CCST: Calibration instruments

2016
Nov/Dec
CCST: Instrument Location
CAP: Characterize NPV and IRR methods

Sep/Oct
CCST: Instrument Location
CAP: Final report distribution  

Jul/Aug
CCST: instrument location plan
CAP: FISCO  

May/Jun
CCST: Pressure measurement methods
CAP: Self-Study workbook

Mar/Apr
CCST: Fluid flow
CAP: Geothermal power plant security

Jan/Feb
CCST: extension wires
CAP: OSI model

Nov/Dec
CAP: OSI Model
CCST: Extension wires

2015
Nov/Dec
CAP: Communications error protection and correction
CCST: Calibration instruments

See all Certification Review Articles

Reader Feedback

We want to hear from you! Please send us your comments and questions about this topic to InTechmagazine@isa.org.