Shop

Artificial Intelligence Notice: ISA prohibits the entry of any ISA intellectual property (“ISA IP”), including standards, publications, training or other materials into any form of Artificial Intelligence (AI) tools, such as ChatGPT. Additionally, creating derivatives of ISA IP using AI is also prohibited without express written permission from ISA’s CEO. In the case of such use, ISA will suspend a licensee’s access to ISA IP, and further legal action will be considered. Please review ISA's policies for Use of AI Tools, Intellectual Property and Terms and Conditions for further information.

Important Notice: Print books are temporarily unavailable. As of 12 August 2025, print books are no longer available for purchase on isa.org, but beginning 1 January 2026, they will be available for purchase through our publishing partner, Wiley. Kindle and ePub formats are still available via the links on each book's product page on isa.org. Learn More.

  • CCST
ISA Certified Control Systems Technician (CCST) program

Certified Control System Technicians (CCSTs) calibrate, document, troubleshoot, and repair/replace instrumentation for systems that measure and control level, temperature, pressure, flow, and other process variables.

CCST question

In logical analysis troubleshooting, which step comes immediately after the first step: Identify and define the problem-?

A. Implement a solution or conduct a test.
B. If the problem is not resolved, reiterate until the problem is found and resolved.
C. Gather information about the problem.
D. Evaluate the information/data.

CCST Answer

The correct answer is C, Gather information about the problem.- Once a problem is identified, data must be gathered and analyzed to determine a viable set of potential actions and solutions.

The logical analysis troubleshooting method consists of (in order):
1. Identify and define the problem.
2. Gather information about the problem.
3. Evaluate the information/data.
4. Propose a solution or develop a test.
5. Implement the solution or conduct the test.
6. Evaluate the results of the solution or test.
7. If the problem is not resolved, reiterate until the problem is found and resolved.
8. If the problem is resolved: document, store/file, and send to the appropriate department for follow up if required.

Reference: Goettsche, L.D. (Editor), Maintenance of Instruments and Systems, Second Edition, ISA, 2005.

Reader Feedback


We want to hear from you! Please send us your comments and questions about this topic to InTechmagazine@isa.org.



Like This Article?

Subscribe Now!

About The Author