Product ISBN/ID: TP03WWID035
Stock Status: In Stock
Mr. Corvigno is a Professional Engineer who has been involved in the integration of SCADA systems, for the Water & Wastewater market, since 1972. Currently he is the president of Aaron Associates of Conn. Inc., which is a premier SCADA Integration Company operating through out the Northeast. Through the years Aaron Associates has been responsible for the integration of more than 300 SCADA system projects. Aaron Associates has yearly SCADA system integration sales of more than $3.0M dollars. Aaron Associates has been integrating SCADA systems into the Water & Wastewater industry for 25 years. As SCADA system Integrators, we have earned our stripes and accordingly we feel the time has come to give something back to this community of SCADA contractors that we embody. During our tenure, Aaron Associates has been able to uncover a few interesting circumstances that continually seem to appear in successfully integrated SCADA projects. These are the same circumstances that almost never appear in unsuccessfully integrated SCADA projects. Therefore, with posterity at sake; we are presenting a hopefully enlightening and modestly humorous look at (10) reasons that Integrators should clearly see as harbingers of “trouble ahead”. We’ve tugged, and we’ve pulled, and we’ve twisted until we finally condensed these observations into our (10) Top Reasons for Unsuccessful SCADA system integrations. Now, whenever you find yourself knee-deep in the integration of a SCADA project and the wheels start falling off….all you’ll have to do to get back on the winning track, is to reflect on these (10) pearly observations of SCADA system integration, alter your course accordingly, and B-I-N-G-O. SCADA Integration Heaven.
- Downloadable files require Adobe Acrobat Reader.
All contents copyright of ISA © 1995-2013 All rights reserved.
Follow Us