Backup link active scheduler On each segment, a process runs called the link active scheduler. It's the time keeper and scheduler of the segment and gives FF determinism. If it fails, backup link active scheduler takes over. It resides in one of the field devices. It gives FF a unique level of fault tolerance.
BDO butanediol
BP British Petroleum
DCS distributed control system
FF Foundation fieldbus technology
H1 hunk one, the 32-kilobit, low-power-signaling FF technology based on ISA 50
H2 hunk two, the 1-2.5 megabit per second high-speed FF technology
I/O input/output
JB junction box
P&ID piping and instrumentation diagram
PID proportional, integral, derivative control algorithm
|